Preparation is the foundation
Old materials, residue, localized high areas, damaged sections, and abrupt height changes can affect the finished floor. The correct work depends on what is found and the requirements of the selected product.
May include
Tear-out, scraping, surface grinding, approved localized correction, securing accessible areas, cleaning, debris handling, and a readiness review.
Important boundary
Structural, active-moisture, hazardous-material, or specialist conditions are identified rather than concealed beneath new flooring.


